AMPA Regional ITS Architecture Update

Functional Requirements: TMC Traffic Metering


Description: This equipment package provides center monitoring and control of traffic metering systems including on ramps, through interchanges, and on the mainline roadway. All types of metering are covered including pre-timed/fixed time, time-based, dynamic and adaptive metering strategies and special bypasses. Metering rates can be calculated based upon historical data or current conditions including traffic, air quality, etc.
Functional Requirements:
  1. The center shall remotely control systems to manage use of the freeways, including ramp, interchange, and mainline metering.
  2. The center shall collect operational status from ramp meters, interchange meters, and mainline meters and compare against the control information sent by the center.
  3. The center shall collect fault data from ramp meters, interchange meters, and mainline meters.
  4. The center shall implement control strategies, under control of center personnel, on some or all of the freeway network devices (e.g. ramp meters, interchange meters, and mainline meters), based on data from sensors monitoring traffic conditions upstream, downstream, and queue data on the approaches to the meters.
Included In: NMDOT Statewide TMC