AMPA Regional ITS Architecture Update

Project Details: RailRunner Positive Train Control


PROJECT OVERVIEW

Project Name:

Project Details: RailRunner Positive Train Control

Description:

Incorporate Positive Train Control capability to RoadRunner

Status:

Planned

Timeframe:

Long

Geographic Scope:

Service Scope

Stakeholders:

Rio Metro Regional Transit District

Service Packages:

APTS01-6 - Transit Vehicle Tracking - Rail Runner PTC

Project Inventory:

Rail Runner On-Board PTC Equipment
Rail Runner Wayside Equipment
Rio Metro Operations Center

FUNCTIONAL REQUIREMENTS

Click on a Project Inventory element from the list above to view functional requirements.

On-board Transit Trip Monitoring

  • The transit vehicle shall track the current location of the transit vehicle.

Transit Center Vehicle Tracking

  • The center shall monitor the locations of all transit vehicles within its network.

INTERFACES

Source Architecture Flows Destination
Rail Runner On-Board PTC Equipment rail location data_ud Rail Runner Wayside Equipment
Rail Runner On-Board PTC Equipment transit vehicle location data Rio Metro Operations Center
Rail Runner On-Board PTC Equipment transit vehicle schedule performance Rio Metro Operations Center
Rail Runner Wayside Equipment rail location data_ud Rio Metro Operations Center
Rio Metro Operations Center train operations data_ud Rail Runner On-Board PTC Equipment

ITS STANDARDS

SDODocument IDTitleType
APTA APTA TCIP-S-001 3.0.4 Standard for Transit Communications Interface Profiles Message/Data

OPERATIONAL CONCEPTS

Stakeholder Roles and Responsibilities
Rio Metro Regional Transit District
Provide rail service for along the NM RailRunner corridor, including dispatching Amtrak and freight rail.