Eagle Pass Regional ITS Architecture (Final)

Interconnect: SWART Flex Route Dispatch and SWART POS Terminal


(Click on image to view full-size)
SWART Flex Route Dispatch and SWART POS Terminal

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
SWART Flex Route Dispatch transit fare information (P)
SWART POS Terminal
SWART POS Terminal transit fare and passenger status (P)
SWART Flex Route Dispatch