(Printable Version)
The following are a list of ITS projects that have been identified for the region. This list was created from an analysis of the existing Transportation Improvement Plan (TIP) for the region and from discussions with the stakeholders. Projects are listed stakeholder (agency).
Select the stakeholder in the box below to jump to that agency's ITS projects.
Projects By Stakeholder
Stakeholder |
Project Name |
Project Status |
Timeframe |
Project Description |
NOAA |
TX 480 Outer Loop ITS |
Planned |
Short |
Flood sensors on TX State Highway 480 Loop to determine if a flood condition exists, and signs to disseminate this information. |
Southwest Area Regional Transit (SWART) |
SWART IT Upgrades |
Planned |
Short |
Upgrades to Information Technology systems for Southwest Area Regional Transit (SWART). Includes scheduling system updates, enhanced interfaces to medical transportation program clearinghouse, fare collection system, maintenance system, closed-circuit te |
SWART Subcontractor |
SWART IT Upgrades |
Planned |
Short |
Upgrades to Information Technology systems for Southwest Area Regional Transit (SWART). Includes scheduling system updates, enhanced interfaces to medical transportation program clearinghouse, fare collection system, maintenance system, closed-circuit te |
Texas Health and Human Services Commission |
SWART IT Upgrades |
Planned |
Short |
Upgrades to Information Technology systems for Southwest Area Regional Transit (SWART). Includes scheduling system updates, enhanced interfaces to medical transportation program clearinghouse, fare collection system, maintenance system, closed-circuit te |
TxDOT |
TX 480 Outer Loop ITS |
Planned |
Short |
Flood sensors on TX State Highway 480 Loop to determine if a flood condition exists, and signs to disseminate this information. |
|