Eagle Pass Regional ITS Architecture (Final)

Interconnect: TxDOT DriveTexas and TxDOT Laredo TMC - STRATIS


(Click on image to view full-size)
TxDOT DriveTexas and TxDOT Laredo TMC - STRATIS

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
TxDOT DriveTexas transportation information for operations (P)
TxDOT Laredo TMC - STRATIS
TxDOT Laredo TMC - STRATIS traffic images (P)
incident information (P)
road network conditions (P)
TxDOT DriveTexas