Eagle Pass Regional ITS Architecture (Final)

Interconnect: TxDOT Water Level Sensors and Signs and TxDOT Laredo TMC - STRATIS


(Click on image to view full-size)
TxDOT Water Level Sensors and Signs and TxDOT Laredo TMC - STRATIS

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
TxDOT Water Level Sensors and Signs water level information_ud (P)
TxDOT Laredo TMC - STRATIS
TxDOT Laredo TMC - STRATIS   TxDOT Water Level Sensors and Signs