Eagle Pass Regional ITS Architecture (Final)

Interconnect: TxDOT Eagle Pass Field Equipment and TxDOT Laredo TMC - STRATIS


(Click on image to view full-size)
TxDOT Eagle Pass Field Equipment and TxDOT Laredo TMC - STRATIS

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
TxDOT Eagle Pass Field Equipment roadway information system status (P)
traffic images (P)
traffic flow (P)
TxDOT Laredo TMC - STRATIS
TxDOT Laredo TMC - STRATIS roadway information system data (P)
video surveillance control (P)
traffic sensor control (P)
TxDOT Eagle Pass Field Equipment