Eagle Pass Regional ITS Architecture (Final)
Texas Home
Eagle Pass Home
Scope
Stakeholders
Stakeholders
Inventory by Stakeholder
Services by Stakeholder
Projects by Stakeholder
Operational Concepts
Inventory
Inventory
Inventory by Stakeholder
Inventory by Entity
Services
Services
Service Package Descriptions
Services by Stakeholder
Architecture
Architecture Interfaces
Architecture Flow Descriptions
Architecture Schematic
Projects
Projects
Projects by Stakeholder
Resources
How to Use Web Site
Systems Engineering Analysis
Project Documents
ITS Architecture
ITS Standards
Glossary
Feedback
Interconnect: TxDOT Eagle Pass Field Equipment and TxDOT Eagle Pass Traffic Operations Center
(Click on image to view full-size)
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source
Architecture Flows
Destination
TxDOT Eagle Pass Field Equipment
environmental sensor data (P)
roadway warning system status (P)
barrier system status (P)
speed monitoring information (P)
hri status (P)
roadway information system status (P)
signal fault data (P)
signal control status (P)
right-of-way request notification (P)
traffic images (P)
traffic flow (P)
TxDOT Eagle Pass Traffic Operations Center
TxDOT Eagle Pass Traffic Operations Center
environmental sensors control (P)
roadway warning system control (P)
barrier system control (P)
speed monitoring control (P)
hri request (P)
hri control data (P)
roadway information system data (P)
signal control commands (P)
video surveillance control (P)
traffic sensor control (P)
TxDOT Eagle Pass Field Equipment