Toledo Regional ITS Architecture Update (Final)

Project Details: City of Toledo Adaptive Signal System


PROJECT OVERVIEW

Project Name:

Project Details: City of Toledo Adaptive Signal System

Description:

This project will upgrade two intersections on the outskirts of the COT coordinated system and allows signal timing optimization based on live traffic demands. In addition, this project will use video to analyze traffic flow at intersections and adjust timing based on historical data obtained by the video. This video can also be utilized for traffic counts.

Status:

Planned

Timeframe:

Short

Geographic Scope:

City of Toledo

Service Scope

Stakeholders:

City of Toledo Division of Transportation

Service Packages:

ATMS03-1 - Traffic Signal Control - City of Toledo

Project Inventory:

City of Toledo Field Equipment
City of Toledo Traffic Management System

FUNCTIONAL REQUIREMENTS

Click on a Project Inventory element from the list above to view functional requirements.

Roadway Signal Controls

  • The field element shall control traffic signals under center control.
  • The field element shall report the current signal control information to the center.
  • The field element shall return traffic signal controller operational status to the center.
  • The field element shall return traffic signal controller fault data to the center.

TMC Signal Control

  • The center shall remotely control traffic signal controllers.
  • The center shall collect traffic signal controller operational status and compare against the control information sent by the center.
  • The center shall collect traffic signal controller fault data from the field.
  • The center shall implement control plans to coordinate signalized intersections based on data from sensors.

INTERFACES

Source Architecture Flows Destination
City of Toledo Field Equipment traffic images City of Toledo Maintenance Dispatch (CLIC)
City of Toledo Field Equipment signal control status City of Toledo Traffic Management System
City of Toledo Field Equipment traffic flow City of Toledo Traffic Management System
City of Toledo Field Equipment signal fault data City of Toledo Traffic Management System
City of Toledo Traffic Management System traffic sensor control City of Toledo Field Equipment
City of Toledo Traffic Management System video surveillance control City of Toledo Field Equipment
City of Toledo Traffic Management System signal control device configuration City of Toledo Field Equipment
City of Toledo Traffic Management System signal system configuration City of Toledo Field Equipment

ITS STANDARDS

SDODocument IDTitleType
AASHTO/ITE/NEMA View List NTCIP Center-to-Center Standards Group Group
AASHTO/ITE/NEMA View List NTCIP Center-to-Field Standards Group Group
AASHTO/ITE/NEMA NTCIP 1201 Global Object Definitions Message/Data
AASHTO/ITE/NEMA NTCIP 1202 Object Definitions for Actuated Traffic Signal Controller (ASC) Units Message/Data
AASHTO/ITE/NEMA NTCIP 1205 Object Definitions for Closed Circuit Television (CCTV) Camera Control Message/Data
AASHTO/ITE/NEMA NTCIP 1208 Object Definitions for Closed Circuit Television (CCTV) Switching Message/Data
AASHTO/ITE/NEMA NTCIP 1209 Data Element Definitions for Transportation Sensor Systems (TSS) Message/Data
AASHTO/ITE/NEMA NTCIP 1210 Field Management Stations (FMS) - Part 1: Object Definitions for Signal System Masters Message/Data
AASHTO/ITE/NEMA NTCIP 1211 Object Definitions for Signal Control and Prioritization (SCP) Message/Data
AASHTO/ITE/NEMA NTCIP 1214 Object Definitions for Conflict Monitor Units (CMU) Message/Data

OPERATIONAL CONCEPTS

Stakeholder Roles and Responsibilities
City of Toledo Division of Transportation
Operate traffic signal systems in the City of Toledo.