Toledo Regional ITS Architecture Update (Final)

Service Packages For: MC - MC07-1


  MC07-1  
Scroll down to view list of elements, responsible agencies (stakeholders), candidate functional areas and requirements, and flows on this diagram.

List of Elements on this Diagram
Click on Element Name to go to Element Detail Page.
Element Name Stakeholder
ODOT District 2 Maintenance Garages ODOT
ODOT Statewide TMC ODOT
ODOT District 2 ITS Field Equipment ODOT
ODOT District 2 Maintenance Vehicles ODOT
ODOT District 2 Storage Facilities ODOT

List of Stakeholder Elements and Roles on this Diagram
Click on Element Name to go to Page with Element Details.
Click on Functional Area/Role to go to Page with Candidate Functional Requirements.
Stakeholder Element Name Functional Area/Role Functional Area Description
ODOT ODOT District 2 Maintenance Garages MCM Roadway Maintenance and Construction This equipment package provides overall management and support for routine maintenance on a roadway system or right-of-way. Services managed include landscape maintenance, hazard removal (roadway debris, dead animals), routine maintenance activities (roadway cleaning, grass cutting), and repair and maintenance of both ITS and non-ITS equipment on the roadway (e.g., signs, traffic controllers, traffic detectors, dynamic message signs, traffic signals, etc.). Environmental conditions information is also received from various weather sources to aid in scheduling routine maintenance activities.
ODOT ODOT District 2 Maintenance Garages MCM Maintenance Decision Support This equipment package recommends maintenance courses of action based on current and forecast environmental and road conditions and additional application specific information. Decisions are supported through understandable presentation of filtered and fused environmental and road condition information for specific time horizons as well as specific maintenance recommendations that are generated by the system based on this integrated information. The recommended courses of action are supported by information on the anticipated consequences of action or inaction, when available.
ODOT ODOT District 2 Maintenance Vehicles MCV Roadway Maintenance and Construction This equipment package includes the on-board systems that support routine non-winter maintenance on a roadway system or right-of-way. Routine maintenance includes landscape maintenance, hazard removal (roadway debris, dead animals), routine maintenance activities (roadway cleaning, grass cutting), and repair and maintenance of both ITS and non-ITS equipment on the roadway (e.g., signs, traffic controllers, traffic detectors, dynamic message signs, traffic signals, etc.).

List of Flows on this Diagram
Click on Architecture Flow to go to Page with Applicable ITS Standards.
Source Element Architecture Flow Destination Element
ODOT District 2 Storage Facilities maintenance materials storage status ODOT District 2 Maintenance Garages
ODOT District 2 Storage Facilities equipment availability ODOT District 2 Maintenance Garages
ODOT District 2 Maintenance Vehicles maint and constr vehicle operational data ODOT District 2 Maintenance Garages
ODOT District 2 Maintenance Vehicles maint and constr dispatch status ODOT District 2 Maintenance Garages
ODOT District 2 ITS Field Equipment field device status ODOT District 2 Maintenance Garages
ODOT Statewide TMC field equipment status ODOT District 2 Maintenance Garages
ODOT District 2 Maintenance Garages maint and constr dispatch information ODOT District 2 Maintenance Vehicles
ODOT District 2 Maintenance Garages equipment maintenance status ODOT Statewide TMC
ODOT District 2 Maintenance Garages storage facility request ODOT District 2 Storage Facilities