Toledo Regional ITS Architecture Update (Final)

Interconnect: TARPS Dispatch - ODOT Statewide TMC


(Click on image to view full-size)
TARPS Dispatch - ODOT Statewide TMC

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
TARPS Dispatch   ODOT Statewide TMC
ODOT Statewide TMC road network conditions (P)
TARPS Dispatch