Toledo Regional ITS Architecture Update (Final)

Interconnect: OTIC Central Dispatch - ODOT 511 Information System


(Click on image to view full-size)
OTIC Central Dispatch - ODOT 511 Information System

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
OTIC Central Dispatch maint and constr work plans (P)
current asset restrictions (P)
ODOT 511 Information System
ODOT 511 Information System   OTIC Central Dispatch