Toledo Regional ITS Architecture Update (Final)

Interconnect: ODOT District 2 Office - ODOT District 2 ITS Field Equipment


(Click on image to view full-size)
ODOT District 2 Office - ODOT District 2 ITS Field Equipment

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
ODOT District 2 Office vehicle signage data (P)
vehicle messages_ud (P)
environmental sensors control (P)
hri request (P)
hri control data (P)
roadway information system data (E)
signal system configuration (E)
signal control plans (E)
signal control device configuration (E)
signal control commands (E)
traffic sensor control (E)
ODOT District 2 ITS Field Equipment
ODOT District 2 ITS Field Equipment short range communications status (P)
vehicle based information_ud (P)
environmental sensor data (P)
right-of-way request notification (E)
hri status (P)
roadway information system status (E)
signal fault data (E)
signal control status (E)
traffic probe data (P)
traffic flow (E)
ODOT District 2 Office