TMACOG Regional ITS Architecture (Final)

Service Packages For: Lucas County Emergency Services 911 - MC06-14


  MC06-14  
Scroll down to view list of elements, responsible agencies (stakeholders), candidate functional areas and requirements, and flows on this diagram.

List of Elements on this Diagram
Click on Element Name to go to Element Detail Page.
Element Name Stakeholder
Lucas County Engineer Dispatch Lucas County Engineer
Lucas County Emergency Communications Center Lucas County Emergency Services 911
TARPS Dispatch Toledo Area Regional Transit Authority (TARTA)
Lucas County Maintenance Vehicles Lucas County Road Maintenance and Repair

List of Stakeholder Elements and Roles on this Diagram
Click on Element Name to go to Page with Element Details.
Click on Functional Area/Role to go to Page with Candidate Functional Requirements.
Stakeholder Element Name Functional Area/Role Functional Area Description
Lucas County Engineer Lucas County Engineer Dispatch MCM Maintenance Decision Support This equipment package recommends maintenance courses of action based on current and forecast environmental and road conditions and additional application specific information. Decisions are supported through understandable presentation of filtered and fused environmental and road condition information for specific time horizons as well as specific maintenance recommendations that are generated by the system based on this integrated information. The recommended courses of action are supported by information on the anticipated consequences of action or inaction, when available.
Lucas County Engineer Lucas County Engineer Dispatch MCM Winter Maintenance Management This equipment package manages winter road maintenance, tracking and controlling snow plow operations, roadway treatment (e.g., salt spraying and other material applications), and other snow and ice control operations. It monitors environmental conditions and weather forecasts and uses the information to schedule winter maintenance activities, determine the appropriate snow and ice control response, and track and manage response operations.
Lucas County Road Maintenance and Repair Lucas County Maintenance Vehicles MCV Winter Maintenance This on-board equipment package supports snow plow operations and other roadway treatments (e.g., salt spraying and other material applications). It supports communications with the center to receive information and instructions that are provided to the vehicle operator and also supports remote control of on-board systems. The equipment package tracks operational status of snow and ice control operations and provides this information back to the center.

List of Flows on this Diagram
Click on Architecture Flow to go to Page with Applicable ITS Standards.
Source Element Architecture Flow Destination Element
Lucas County Engineer Dispatch roadway maintenance status TARPS Dispatch
Lucas County Engineer Dispatch maint and constr dispatch information Lucas County Maintenance Vehicles
Lucas County Maintenance Vehicles maint and constr vehicle operational data Lucas County Engineer Dispatch
Lucas County Maintenance Vehicles maint and constr dispatch status Lucas County Engineer Dispatch
Lucas County Emergency Communications Center maint and constr resource request Lucas County Engineer Dispatch
Lucas County Engineer Dispatch roadway maintenance status Lucas County Emergency Communications Center
Lucas County Engineer Dispatch maint and constr resource response Lucas County Emergency Communications Center