Interface: OTC Central Dispatch and OTC Field Equipment

OTC Central Dispatch and OTC Field Equipment

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned

Send Your Comments

SourceArchitecture FlowsDestination
OTC Central Dispatch roadway information system status (P)

roadway obstructions system control_ud (P)

roadway information system data (E)

traffic sensor control (P)

freeway control data (P)

OTC Field Equipment
OTC Field Equipment roadway information system data (P)

roadway obstructions data_ud (P)

roadway information system status (E)

traffic flow (P)

freeway control status (P)

OTC Central Dispatch

Last updated: 03-17-10