Regional Architecture Logo
 

Send Your Comments

E-Mail

Logo

Regional Architecture Banner Architecture Geographic Scope

Interface: ODOT District 4 Field Equipment To ODOT District 4 Maintenance Garages

ODOT District 4 Field Equipment to ODOT District 4 Maintenance Garages Interface Diagram

 

Architecture Flow Definitions

field device status   (Planned)   Applicable ITS Standards

Reports from field equipment (sensors, signals, signs, controllers, etc.) which indicate current operational status.

 

roadway information system data   (Planned)   Applicable ITS Standards

Information used to initialize, configure, and control roadside systems that provide driver information (e.g., dynamic message signs, highway advisory radio, beacon systems). This flow can provide message content and delivery attributes, local message store maintenance requests, control mode commands, status queries, and all other commands and associated parameters that support remote management of these systems.

 

roadway information system status   (Planned)   Applicable ITS Standards

Current operating status of dynamic message signs, highway advisory radios, beacon systems, or other configurable field equipment that provides dynamic information to the driver.

 

roadway treatment system control   (Planned)   Applicable ITS Standards

Control data for remotely located, automated devices, that affect the roadway surface (e.g. de-icing applications).

 

roadway treatment system status   (Planned)   Applicable ITS Standards

Current operational status of automated roadway treatment devices (e.g., anti-icing systems).

 

traffic images   (Planned)   Applicable ITS Standards

High fidelity, real-time traffic images suitable for surveillance monitoring by the operator or for use in machine vision applications. This flow includes the images and the operational status of the surveillance system.

 

video surveillance control   (Planned)   Applicable ITS Standards

Information used to configure and control video surveillance systems.

 

work zone warning status   (Planned)   Applicable ITS Standards

Status of a work zone safety monitoring and warning devices. This flow documents system activations and includes additional supporting information (e.g., an image) that allows verification of the alarm.

 

Last updated on 09-18-2004 using Ronald C. Ice and Associates Web Spinner Technology.