Interface: NYSDOT Region 2 TOC and NYS Police Dispatch
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
NYSDOT Region 2 TOC | alert status (P) | NYS Police Dispatch |
NYS Police Dispatch | amber alert_ud (P) | NYSDOT Region 2 TOC |