Interface: ODOT 511 Information System and Ozone Action Day System
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
| Source | Architecture Flows | Destination |
|---|---|---|
| ODOT 511 Information System | Ozone Action Day System | |
| Ozone Action Day System | air quality information (P) | ODOT 511 Information System |