Interface: OTC Toll Administration and OTC Toll Collection Equipment
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
| Source | Architecture Flows | Destination |
|---|---|---|
| OTC Toll Administration | toll instructions (P) | OTC Toll Collection Equipment |
| OTC Toll Collection Equipment | toll transactions (P) | OTC Toll Administration |