Interface: DDOT TMC and Roadway Operations Patrol
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
| Source | Architecture Flows | Destination |
|---|---|---|
| DDOT TMC | road network conditions (P) | Roadway Operations Patrol |
| Roadway Operations Patrol | DDOT TMC |