Interface: DDOT TMC and Local DPW Dispatch
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
| Source | Architecture Flows | Destination |
|---|---|---|
| DDOT TMC | work plan coordination (P) | Local DPW Dispatch |
| Local DPW Dispatch | work plan coordination (P) | DDOT TMC |