Interface: DDOT TMC and DDOT Ramp Meters
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
| Source | Architecture Flows | Destination |
|---|---|---|
| DDOT TMC | DDOT Ramp Meters | |
| DDOT Ramp Meters | field device status (P) | DDOT TMC |