Interface: DDOT PTSA and DC Circulator Website
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
| Source | Architecture Flows | Destination |
|---|---|---|
| DDOT PTSA | transit schedule adherence information (E) transit probe data (E) | DC Circulator Website |
| DC Circulator Website | DDOT PTSA |