Interface: MWCOG TPB Database and DDOT PTSA
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
| Source | Architecture Flows | Destination |
|---|---|---|
| MWCOG TPB Database | archive coordination (P) | DDOT PTSA |
| DDOT PTSA | archive coordination (P) | MWCOG TPB Database |