VTrans Rutland TMC and VTrans Traffic Signals

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned

SourceArchitecture FlowsDestination
VTrans Rutland TMC hri request (P)

hri control data (P)

traffic sensor control (P)

signal control data (P)

VTrans Traffic Signals
VTrans Traffic Signals request for right-of-way (P)

hri status (P)

traffic flow (P)

signal control status (P)

VTrans Rutland TMC

Last updated: 07-01-08