VTrans Rutland TMC and VTrans Vehicle Detectors

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned

SourceArchitecture FlowsDestination
VTrans Rutland TMC traffic sensor control (P)

VTrans Vehicle Detectors
VTrans Vehicle Detectors traffic flow (P)

VTrans Rutland TMC

Last updated: 07-01-08