|
Austin Regional ITS Architecture |
Rail Operations Centers and CapMetro Wayside Equipment(E) = Existing Flow
|
| Source | Architecture Flows | Destination |
| Rail Operations Centers | CapMetro Wayside Equipment | |
| CapMetro Wayside Equipment | hri advisories_ud (E) | Rail Operations Centers |