|
Austin Regional ITS Architecture |
Municipal ITS Field Equipment and CapMetro Wayside Equipment(E) = Existing Flow
|
| Source | Architecture Flows | Destination |
| Municipal ITS Field Equipment | hri operational status (P) | CapMetro Wayside Equipment |
| CapMetro Wayside Equipment | track status (P) | Municipal ITS Field Equipment |