|
The following equipment packages are associated with the "ODOT District 4 Office" element. Select the "Details" icon to see the detailed process specifications that support each equipment package, or consult the National ITS Architecture web site for more information.
MCM Environmental Information Collection
This equipment package collects current road and weather conditions using data collected from environmental sensors deployed on and about the roadway. In addition to fixed sensor stations at the roadside, this equipment package also collects environmental information from sensor systems located on Maintenance and Construction Vehicles, and sensor data that is made available by other systems..
MCM Environmental Information Processing
This equipment package processes current and forecast weather data, road condition information, local environmental data, and uses internal models to develop specialized detailed forecasts of local weather and surface conditions. The processed environmental information products are presented to the user.
This equipment package supports coordinated response to highway incidents. Incident notifications are shared, incident response resources are managed, and the overall incident situation and incident response is coordinated among allied response organizations.
MCM Work Activity Coordination
This equipment package disseminates work activity schedules to other agencies. Work schedules are coordinated, factoring in the needs and activities of other agencies and adjacent jurisdictions.
This equipment package assimilates current and forecast road conditions and surface weather information using a combination of weather service provider information and an array of environmental sensors deployed on and about the roadway. The collected environmental information is monitored and presented to the operator. This information can be used to more effectively deploy road maintenance resources, issue general traveler advisories, and support location specific warnings to drivers. Other equipment packages process the collected information and provide decision support.
Control system for efficient freeway management including integration of surveillance information with freeway road geometry, vehicle control such as ramp metering, CMS, HAR. Interface to coordinated traffic subsystems for information dissemination to the public.
This Equipment package provides the capability to traffic managers to detect and verify incident. This capability includes analyzing and reducing the collected data from traffic surveillance equipment, including planned incidents and hazardous conditions.
TMC Incident Dispatch Coordination/Communication
This Equipment package provides the capability for an incident response formulation function minimizing the incident potential, incident impacts, and/or resources required for incident management including proposing and facilitating the dispatch of emergency response and service vehicles as well as coordinating response with all appropriate cooperating agencies.
TMC Probe Information Collection
This Equipment package provides the capability to accept and process probe vehicle information. This capability shall be provided through the use of additional hardware and probe vehicle control and tracking software.
TMC Work Zone Traffic Management
This equipment package supports coordination with maintenance systems so that work zones are established that have minimum traffic impact. Traffic control strategies are implemented to further mitigate traffic impacts associated with work zones that are established.
This Equipment package provides monitoring and remote diagnostics of field equipment to detect field equipment failures, issues problem reports, and tracks the repair or replacement of the failed equipment.
|
Last updated on 04-07-2004 using
Web Spinner Technology.