Interface: ODOT 511 Information System and Ozone Action Day System
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
ODOT 511 Information System | Ozone Action Day System | |
Ozone Action Day System | air quality information (P) | ODOT 511 Information System |