Interface: ODOT District 4 Signal Control System and Buckeye Traffic Website
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
ODOT District 4 Signal Control System | road network conditions (P) | Buckeye Traffic Website |
Buckeye Traffic Website | ODOT District 4 Signal Control System |