Eastgate Regional ITS Architecture Update
Interface: ODOT District 4 Signal Control System and Other County Traffic Engineering
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Send Your Comments
Source
Architecture Flows
Destination
ODOT District 4 Signal Control System
traffic control coordination (P)
traffic information coordination (P)
Other County Traffic Engineering
Other County Traffic Engineering
traffic information coordination (P)
ODOT District 4 Signal Control System
Last updated: 01-30-14