Interface: City of Niles Field Equipment and Railroad Wayside Equipment
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
City of Niles Field Equipment | hri operational status (P) | Railroad Wayside Equipment |
Railroad Wayside Equipment | track status (P) | City of Niles Field Equipment |