Eastgate Regional ITS Architecture Update
Interface: ODOT District 4 Field Equipment and Railroad Wayside Equipment
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Send Your Comments
Source
Architecture Flows
Destination
ODOT District 4 Field Equipment
intersection blockage notification (P)
hri operational status (P)
Railroad Wayside Equipment
Railroad Wayside Equipment
track status (P)
arriving train information (P)
ODOT District 4 Field Equipment
Last updated: 01-30-14