Eastgate Regional ITS Architecture Update
Interface: ODOT District 4 Field Equipment and ODOT District 4 Signal Control System
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Send Your Comments
Source
Architecture Flows
Destination
ODOT District 4 Field Equipment
request for right-of-way (P)
intersection blockage notification (P)
hri status (P)
signal control status (E)
traffic images (P)
traffic flow (E/P)
ODOT District 4 Signal Control System
ODOT District 4 Signal Control System
hri request (P)
hri control data (P)
signal control data (E)
traffic sensor control (P)
video surveillance control (P)
ODOT District 4 Field Equipment
Last updated: 01-30-14