Interface: ODOT District 4 Field Equipment and ODOT District 4 Signal Control System

ODOT District 4 Field Equipment and ODOT District 4 Signal Control System

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned

Send Your Comments

SourceArchitecture FlowsDestination
ODOT District 4 Field Equipment request for right-of-way (P)

intersection blockage notification (P)

hri status (P)

signal control status (E)

traffic images (P)

traffic flow (E/P)

ODOT District 4 Signal Control System
ODOT District 4 Signal Control System hri request (P)

hri control data (P)

signal control data (E)

traffic sensor control (P)

video surveillance control (P)

ODOT District 4 Field Equipment

Last updated: 01-30-14