New Mexico Statewide ITS Architecture
Interface: City of Roswell ITS Field Equipment and City of Roswell Traffic Operations Center
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Send Your Comments
Source
Architecture Flows
Destination
City of Roswell ITS Field Equipment
hri status (P)
roadway information system status (P)
right-of-way request notification (P)
signal fault data (E)
signal control status (E)
traffic images (E)
traffic flow (E)
City of Roswell Traffic Operations Center
City of Roswell Traffic Operations Center
hri request (P)
hri control data (P)
roadway information system data (P)
signal system configuration (E)
signal control plans (E)
signal control device configuration (E)
signal control commands (E)
video surveillance control (E)
traffic sensor control (P)
City of Roswell ITS Field Equipment
Last updated: 10-10-12