Interface: Rail Operators Wayside Equipment and Tribal ITS Field Equipment

Rail Operators Wayside Equipment and Tribal ITS Field Equipment

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned

Send Your Comments

SourceArchitecture FlowsDestination
Rail Operators Wayside Equipment track status (P)

Tribal ITS Field Equipment
Tribal ITS Field Equipment hri operational status (P)

Rail Operators Wayside Equipment

Last updated: 10-10-12