Interface: NMDOT Wayside Equipment and Tribal ITS Field Equipment

NMDOT Wayside Equipment and Tribal ITS Field Equipment

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned

Send Your Comments

SourceArchitecture FlowsDestination
NMDOT Wayside Equipment track status (P)

Tribal ITS Field Equipment
Tribal ITS Field Equipment hri operational status (P)

NMDOT Wayside Equipment

Last updated: 10-10-12