Interface: NMDOT Ramp Meters and NMDOT Statewide TMC

NMDOT Ramp Meters and NMDOT Statewide TMC

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned

Send Your Comments

SourceArchitecture FlowsDestination
NMDOT Ramp Meters traffic flow (P)

traffic metering status (P)

NMDOT Statewide TMC
NMDOT Statewide TMC traffic sensor control (P)

traffic metering control (P)

NMDOT Ramp Meters

Last updated: 10-10-12