Local Traffic Control Center and Local Traffic Field Equipment

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned

Send Your Comments
SourceArchitecture FlowsDestination
Local Traffic Control Center signal control data (P)

Local Traffic Field Equipment
Local Traffic Field Equipment signal control status (P)

request for right-of-way (P)

Local Traffic Control Center

Last updated: 12-31-08