Interface: NYSDOT Statewide Information Exchange Network (IEN) - Other NYSDOT Regional TOCs

NYSDOT Statewide Information Exchange Network (IEN) to Other NYSDOT Regional TOCs Interface Diagram

Architecture Flow Definitions

incident report_ud  (Planned)  

Report of an identified incident including incident location, type, severity and the information necessary to initiate an appropriate incident response.

incident response coordination_ud  (Planned)  

Incident response procedures and current incident response status that are shared between allied response agencies to support a coordinated response to incidents. This flow provides current situation information, including a summary of incident status and its impact on the transportation system and other infrastructure, and current and planned response activities. This flow also coordinates a positive hand off of responsibility for all or part of an incident response between agencies.

road network conditions_ud  (Existing)  

Current and forecasted traffic information, road and weather conditions, incident information, and other road network status. Either raw data, processed data, or some combination of both may be provided by this architecture flow.

traffic control coordination  (Planned)  Applicable ITS Standards

Information transfers that enable remote monitoring and control of traffic management devices. This flow is intended to allow cooperative access to, and control of, field equipment during incidents and special events and during day-to-day operations. This flow also allows 24-hour centers to monitor and control assets of other centers during off-hours, allows system redundancies and fail-over capabilities to be established, and otherwise enables integrated traffic control strategies in a region.

traffic information coordination  (Existing)  Applicable ITS Standards

Traffic information exchanged between TMC’s. Normally would include incidents, congestion data, traffic data, signal timing plans, and real-time signal control information.