Interface: NYSDOT Statewide Information Exchange Network (IEN) - I-95 CC Information Exchange Network

NYSDOT Statewide Information Exchange Network (IEN) to I-95 CC Information Exchange Network Interface Diagram

Architecture Flow Definitions

emergency traffic control information  (Planned)  Applicable ITS Standards

Status of a special traffic control strategy or system activation implemented in response to an emergency traffic control request, a request for emergency access routes, a request for evacuation, a request to activate closure systems, a request to employ driver information systems to support public safety objectives, or other special requests. Identifies the selected traffic control strategy and system control status.

emergency traffic control request  (Planned)  Applicable ITS Standards

Special request to preempt the current traffic control strategy in effect at one or more signalized intersections or highway segments, activate traffic control and closure systems such as gates and barriers, activate safeguard systems, or use driver information systems. For example, this flow can request all signals to red-flash, request a progression of traffic control preemptions along an emergency vehicle route, request a specific evacuation traffic control plan, request activation of a road closure barrier system, or place a public safety or emergency-related message on a dynamic message sign.

evacuation information  (Planned)  Applicable ITS Standards

Evacuation instructions and information including evacuation zones, evacuation times, and reentry times.

incident report_ud  (Planned)  

Report of an identified incident including incident location, type, severity and the information necessary to initiate an appropriate incident response.

incident response coordination_ud  (Planned)  

Incident response procedures and current incident response status that are shared between allied response agencies to support a coordinated response to incidents. This flow provides current situation information, including a summary of incident status and its impact on the transportation system and other infrastructure, and current and planned response activities. This flow also coordinates a positive hand off of responsibility for all or part of an incident response between agencies.