Interface: Local Fire/EMS Vehicles and Local Traffic Field Equipment
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
Local Fire/EMS Vehicles | local signal preemption request (P) | Local Traffic Field Equipment |
Local Traffic Field Equipment | Local Fire/EMS Vehicles |