Interface: Rail Wayside Equipment and Local Traffic Field Equipment

Rail Wayside Equipment and Local Traffic Field Equipment

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned

Send Your Comments

SourceArchitecture FlowsDestination
Rail Wayside Equipment track status (P)

Local Traffic Field Equipment
Local Traffic Field Equipment hri operational status (P)

Rail Wayside Equipment

Last updated: 09-18-10