Interface: NYSDOT Traffic Signals and Rail Wayside Equipment
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
NYSDOT Traffic Signals | hri operational status (P) | Rail Wayside Equipment |
Rail Wayside Equipment | track status (P) | NYSDOT Traffic Signals |