511 and MTC TIC

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned

SourceArchitecture FlowsDestination
511   MTC TIC
MTC TIC transit incident information (P)

road network conditions (E)

511