511 and MTC TIC
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source
Architecture Flows
Destination
511
MTC TIC
MTC TIC
transit incident information (P)
road network conditions (E)
511