511 and MTC Regional Trip Planner
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source
Architecture Flows
Destination
511
vehicle tagging system sensor status_ud (P)
MTC Regional Trip Planner
MTC Regional Trip Planner
511