Projects (By Sponsor)

(PDF Version)

Existing: Existing projects are projects currently in place and operating.
Ongoing: Ongoing projects are projects partly implemented with imminent or ongoing expansion, upgrades, or development.
Future: Future projects are proposed projects, which may or may not be programmed.

N/A - ITS projects that are not reflected in market package diagrams specifically. Primarily these projects are ITS in nature, but do not involve data exchange with other systems.
Stakeholder Category Project Name Project Description Project Status ITS Service Diagram

AC Transit

Transit Information Real-Time Passenger Seat Availability Information System that identifies real-time vehicle occupancy Future APTS10-1
Transit Management Automated Passenger Counters (APC) Passenger counting system on part of fleet. Existing APTS10-1
Transit Information Fleetwide Automatic Vehicle Location (AVL) Systems Transit vehicle automated location system Ongoing APTS01-1
Transit Management Automated Passenger Counter (APC) Upgrade/Expansion Upgrade and expand automated passenger counting system to full fleet. Ongoing APTS10-1
Transit Management Automated Bus Routing Automated bus routing system to accommodate real time demand Future APTS03-1
APTS02-01
Transit Management Integrated Central Dispatch and Emergency Operations Facility functions as an EOC during emergencies. Agencies would include any agencies that would utilize the EOC during emergencies. Future EM09-1
APTS02-01
Transit Management Next Generation On-Board Surveillance Security surveillance system inside the vehicle Future APTS05-01
Transit Information Real-time Bus Arrival Information Real time bus arrival time information Ongoing APTS08-02
APTS08-01
Transit Information Voice Annunciator/ Light Emitting Diode (LED) Signs Transit vehicle information annunciation and signing system Ongoing APTS08-01
APTS08-02
Transit Vehicle Priority Bus Signal Priority Allow transit vehicles higher priority at intersections Ongoing APTS09-01
Transit Management Mobile Command Bus Transit vehicle communication and control system Future APTS05-01
Transit Management Enhanced Operations and Data Analysis Analyzing transit management data for better performance Future AD1-4
Transit Management Transit Planning Document Archival and Data Warehouse Transit operation data archive Future AD1-4
Transit Management Transit Signal Priority (TSP) Feedback Capability Transit Communication Future APTS09-01
On-Vehicle Safety System Collison Avoidance and Automated Docking Systems Vehicle on-board safety system Future APTS09-01
Transit Security Alternate Emergency Computer Center for Operational Continuity Transit emergency management Future N/A
Transit Management Geospatial Information Systems Enhancement Transit Management with GIS Future N/A
ITS Integration Interagency Communications Upgrade and Rebuild Mesh network, enhanced capability, etc. Future N/A

ACCMA

ITS Integration Closed Circuit Television (CCTV) Camera Integration CCTV camera image/data integration Ongoing ATMS03-01
ATMS01-01
Toll Management I-580 Demonstration High Occupancy Toll (HOT) Lane HOV-Toll lane Future ATMS10-2
ITS Integration I-580 and I-238 Intelligent Transportation System (ITS) ITS integration between multiple corridors Future ATMS08-05
ATMS07-04
ITS Integration East Bay SMART Corridor Advanced Transportation Management System (ATMS) ATMS Existing High-Level Diagram
ATMS03-03
ATMS01-03
Arterial Traffic Management Transportation Management Center Arterial traffic management coordination Future ATMS07-03
Arterial Traffic Management; Freeway Traffic Management I-80 Integrated Corridor Management Integrated freeway and arterial coordination that will include CCTV cameras, CMS, variable advisory speed signs, ramp metering, trailblazers, vehicle detection, and alternative mode coordination Future High-Level Diagram
ATMS07-11

Antioch

Freeway Traffic Management Highway 4 Corridors Traffic Management Plan Freeway traffic management coordination Ongoing ATMS08-10
ATMS07-09
ATMS06-09

BART

Transit Management Station Database/E-BART Bart extension to East Contra Costa County with associated transit management Existing AD1-4
Transit Management Radio Communications Transit vehicle radio communication Existing APTS02-02
Transit Management EZ Rider Smart Card - transition to TransLink Smart Card Implementation Transit fare collection system Ongoing High-Level Diagram
APTS04-02
Transit Management Fare Collection System Transit fare collection system Existing APTS04-02
Arterial Traffic Management Closed Circuit Television (CCTV) Deployment Transit system CCTV camera deployment Existing APTS05-02
ITS Integration Real-Time Information System Transit system real time information Ongoing APTS08-03
Transit Management Train Arrival Signs and Annunciator System Transit vehicle arrival sign and annunciation system for the travelers Existing APTS08-03
Transit Information Trip Planning Transit trip planning and connection information Existing APTS08-03
Transit Information Website (www.bart.gov) Dynamic Transit Information Transit information website Existing APTS08-03

Benicia

Transit AVL/CAD Automated Vehicle Locator Monitoring bus locations for dispatch purposes Future APTS01-6
Transit Management Scheduling Software Scheduling paratransit trips throughout service area Future APTS03-5
Traveler Information Destination Signs Public Information Existing APTS08-11
Transit Security Security Cameras and Control Station Enhance security on board buses Future APTS05-08
Transit Management Radios Improve communications between buses Future APTS02-11
Transit Management Fareboxes, Probe, and Computer Program Improve the reliability of data from fareboxes Future APTS04-12

Caltrain

Transit Management Automated Passenger Counters (APC) Automated passenger counting system Future APTS10-2
Transit AVL/CAD Automated Vehicle Location (AVL) Automated vehicle location system Ongoing APTS01-2
Transit Information Real-Time Information Collection and Dissemenation Transit real time information collection and dissemination system Future APTS08-05
APTS08-04
APTS02-03
APTS01-2
Transit Information Predictive Arrivals/Departures Transit vehicle arrival and departure information Ongoing APTS08-05
APTS08-04
APTS01-2
Transit Information Train Arrival Signs and Annunciator System Transit vehicle arrival information Ongoing APTS08-05
APTS08-04

Caltrans

Transit Management Bay Area Video Upgrade Transit vehicles/infrastructure surveillance system upgrade Future APTS08-05
APTS08-04
Transit Management El Camino Real Signal Interconnect With San Mateo C/CAG. Ongoing ATMS03-02
Freeway Traffic Management I-80 Integrated Corridor Mobility (ICM) Integrated corridor operations, adaptive ramp metering, CCTV cameras, CMS, trailblazers, variable adviosry speed signs, vehicle detection, and alternative mode coordination Future High-Level Diagram
ATMS04-1
Freeway Traffic Management I-880 Integrated Corridor Management (ICM) (High to Whipple) From High to Whipple, I-238, I-580. Integrated corridor operations, adaptive ramp metering, CCTV cameras, CMS, trailblazers. Future High-Level Diagram
ATMS04-1
Freeway Traffic Management I-880 Integrated Corridor Management (ICM) (I-980 to High) Integrated corridor operations, adaptive ramp metering, CCTV cameras, CMS, trailblazers Future High-Level Diagram
ATMS04-1
Freeway Traffic Management Intelligent Transportation System (ITS) Components for Corridor Management Improvement Account (CMIA) Funded Projects Traffic Operations System (TOS) elements on all Capital Improvement Projects (CIP) Future ATMS04-1
Freeway Traffic Management Traffic Operations System (TOS) and Traffic Management Center (TMC) Traffic management center Existing ATMS04-1
Freeway Traffic Management I-680 Smart High Occupancy Toll (HOT) Carpool Lane HOV-Toll lane management system Future ATMS10-3
Freeway Traffic Management Caltrans Highway Information Network (CHIN) Telephone traveler information system Existing ATIS01-02
ATIS01-01
Freeway Traffic Management I-880 Corridor Traffic Operations System Elements and Ramp Metering Highway ramp metering control Future High-Level Diagram
ATMS04-1
Freeway Traffic Management Pre-Pass Project Statewide effort on Cal Statewide ITS Architecture Future CVO03-1
Freeway Traffic Management I-680 Corridor Traffic Operations System Elements and Ramp Metering Highway ramp metering control Future ATMS04-1
Freeway Traffic Management SR 237 Corridor Traffic Operations System Elements and Ramp Metering Highway ramp metering control Future ATMS04-1
Freeway Traffic Management SR 85 Corridor Traffic Operations System Elements and Metering Highway ramp metering control Future ATMS04-1
Freeway Traffic Management US 101 Corridor Traffic Operations System Elements and Metering Highway ramp metering control Future ATMS04-1
Freeway Traffic Management Traffic Operations System Field Element Installation: SR 237 and I-880 ITS field devices deployment Future High-Level Diagram
ATMS04-1

Campbell

Arterial Traffic Management Hamilton Avenue Intelligent Transportation System (ITS) Integrated arterial management system Existing ATMS03-10
Arterial Traffic Management Winchester Blvd Intelligent Transportation System (ITS) Integrated arterial management system Future ATMS03-10
Arterial Traffic Management Closed Circuit Television (CCTV) Installation on Hamilton Overpass ITS field devices deployment Future ATMS01-10
Arterial Traffic Management Reactivation of Existing Traffic Count Stations ITS field devices deployment Future ATMS19-1
AD1-8
Arterial Traffic Management Traffic Signal System Upgrade Signal upgrade Future ATMS03-10
Arterial Traffic Management Installation of Pedestrian Countdown Timers ITS field devices deployment Future ATMS03-10
Arterial Traffic Management Winchester Blvd Signal Timing Signal improvement Future ATMS03-10

CHP

Arterial Traffic Management Computer-Assisted Dispatch (CAD) Upgrade Computer assisted dispatching system for emergency response Existing EM01-1

Concord

Arterial Traffic Management Concord-Walnut Creek and Pleasant Hill Smart Corridor along I-680 Integrated arterial and freeway management system Future ATMS06-11
ATMS06-10
ATMS03-10
ATMS01-10
Arterial Traffic Management Concord Closed Circuit Television (CCTV) ITS field devices deployment Existing ATMS01-10
Arterial Traffic Management Concord Signal System Upgrade and Traffic Management Center (TMC) Signal upgrade Existing ATMS03-10
Arterial Traffic Management Concord Kirker Pass Road/Ygnacio Valley Road Arterial Management Plan Integrated arterial management system Existing ATMS03-10

County Connection

Transit Management Automated Vehicle Location (AVL) Vehicle Probe Automated vehicle location system Existing APTS01-6

County of Santa Clara

Arterial Traffic Management Intelligent Transportation System (ITS) Enhancements on Bascom Ave ITS field devices deployment Future ATMS01-10
Arterial Traffic Management IIntelligent Transportation System (ITS) Enhancements on Santa Teresa Blvd ITS field devices deployment Future ATMS01-10
Arterial Traffic Management Traffic Operations System (TOS) Improvements Signal improvement Ongoing ATMS03-10
Arterial Traffic Management Adaptive Pedestrian Timing Signal improvement Future ATMS03-10
Arterial Traffic Management Installation of Pedestrian Countdown Timers ITS field devices deployment Future ATMS03-10
Arterial Traffic Management Adaptive Bicycle Timing Signal improvement Ongoing/Future ATMS03-10

Cupertino

Arterial Traffic Management De Anza Blvd. Advanced Traffic Management System Integrated arterial management system Existing ATMS03-10
Arterial Traffic Management Interchange Improvements-Ramp Meter Signal/Arterial Traffic Signal Interconnection Integrated arterial and freeway management system Existing ATMS03-10
ATMS01-10
Arterial Traffic Management Adaptive Traffic Signal Control System Signal improvement Existing ATMS03-10

Daly City

Arterial Traffic Management Traffic Signal System Upgrade Signal upgrade Future ATMS03-10
Arterial Traffic Management Citywide Signal Coordination Signal Coordination Future ATMS03-10
Arterial Traffic Management Communications Master Plan Communication System Upgrade Future N/A

ECCTA

Transit Management Automatic Vehicle Location (AVL) System Automated vehicle location system Ongoing APTS01-6

Fairfield

Transit Management Intelligent Transportation Systems (Automatic Vehicle Location (AVL), Transit Signal Priority (TSP) for City transit operators) Automated vehicle location system Future APTS09-07
APTS01-6

Fairfield/Suisun Transit

Transit Management Automated Vehicle Location (AVL) System Automated vehicle location system Future APTS03-5
APTS02-11
APTS01-6
Transit Information Advanced Traveler Information System (ATIS) Traveler information system Future APTS08-10
Transit Management Communications Master Plan Transit management improvement Future N/A

Fremont

Arterial Traffic Management Traffic Management Center (TMC) Traffic management center Ongoing ATMS03-10
Arterial Traffic Management Communication Master Plan Upgrade all transportation related communications from serial to ethernet Ongoing N/A
Arterial Traffic Management; Transit Management Special Events Management Transportation Plan Adaptive signal control, transit signal priority, traffic monitoring, traveler information system Future ATMS06-11
ATMS06-10
ATMS03-10
ATMS01-10
APTS09-07

GGBHTD

Transit Management Advanced Communication and Information System CAD/AVL, RTIS, TSP, bus telecom system, ATIS, APC, AVM, AVA Future APTS10-2
APTS09-02
APTS01-3
APTS08-06
APTS06-3
APTS02-05
Transit Management Ferry Automatic Fare Collection (AFC) Ferry Fare Management with new faregates and TVMs and data system Future APTS02-05
Transit Management Bus Farebox Replacement Bus fare management with farebox and data system upgrade Future APTS04-06
Transit Information Advanced Traveler Information System (ATIS) Traveler information system Future APTS08-06
Toll Management Fastrak Electronic Toll Collection (ETC) Toll management system Existing ATMS10-1

Gilroy

Transit Vehicle Priority Bus Signal Priority for Gilroy Community Bus Transit Signal Priority Future APTS02-11
Arterial Traffic Management Adaptive Traffic Signal Control System Signal improvement Future ATMS03-10
Arterial Traffic Management Traffic Signal System Upgrade Signal upgrade Future ATMS03-10
Parking Management Electronic Parking Enforcement/Parking Management (Downtown Along Monterey Street) Electronic parking monitoring system Future ATMS16-3
Infrastructure Security / Surveillance Flood Watch Cameras Cameras monitoring water level Future EM07-1
Emergency/Event Management Event Management System Develop and deploy CMS, HAR, and information kiosks to provide traveler information system for special events (i.e. the Gilroy Garlic Festival) and incident management in the Gilroy (i.e. flooding in southern part of City). Install 2-CMS on SB US 101, 3-C Future EM07-1
ATMS08-11

Hayward

Arterial Traffic Management Citywide Emergency Vehicle Preemption Signal Improvement Ongoing EM02-6
EM02-5
EM02-4
Arterial Traffic Management Traffic Signal System Upgrade Signal Upgrade Ongoing ATMS03-10
Arterial Traffic Management Citywide Traffic Signal Coordination Signal Coordination Ongoing ATMS03-10
Arterial Traffic Management Installation of Pedestrian Countdown Timers Signal Improvement Ongoing ATMS03-10
Arterial Traffic Management Traffic Operations System (TOS)/Signal Coordination Signal Improvement Future ATMS03-10
Arterial Traffic Management Adaptive Traffic Signal Program Signal Improvement Future ATMS03-10
Arterial Traffic Management Adaptive Pedestrian Timing Signal Improvement Future ATMS03-10
Arterial Traffic Management Adaptive Bicycle Timing Signal Improvement Future ATMS03-10
Arterial Traffic Management Citywide Transportation Management System Advanced Traffic Management System for the following corridors: Clawiter Road/880 Reliever Route, Hesperian Blvd, Santa Clara St-Harder Road, Huntwood Avenue, Mission Blvd, Foothill Blvd, Second Street, A Street, B Street, D Street-Winton Avenue, Jackson Future ATMS03-10
ATMS01-10
Arterial Traffic Management Downtown Hayward CBD Traffic and Parking Improvement Project Central Business District traffic management Future ATMS16-3

LAVTA

Transit Management Automated Passenger Counters (APC) Identifying transit passenger number Existing APTS10-2
Transit AVL/CAD Automated Vehicle Location (AVL) System Transit AVL Existing APTS01-3
Transit AVL/CAD LAVTA Computer-Aided Dispatch (CAD) Transit AVL and CAD Existing APTS03-2
APTS02-06
Transit Management On-Board Communications Transit vehicle communication system Existing APTS02-06
Transit Information Web-Based Real-Time Transit Information Internet transit information Existing APTS03-2
Transit Management Paratransit Interactive Phone/Web Scheduling Software paratransit management Future APTS08-07
Transit Management Farebox Collection System Transit fare collection Existing APTS03-2
Transit Management Onboard Security Cameras Transit vehicle surveillance Existing/Ongoing APTS04-07
Transit Management Cameras Vehicle Condition, Detectors and Driver Safety Training Transit vehicle surveillance Ongoing APTS05-05
APTS05-05
Transit Information Annunciators Transit information annunciators Existing APTS08-07
Transit Information On-Street Dynamic Message Signs Transit info-related on street signs Ongoing APTS08-07
Transit Vehicle Priority Transit Signal Priority (Vehicle to Roadside) Allowing transit vehicles higher priority at intersections Ongoing APTS09-03
Transit Management Communication Radios Communication dispatch, operators, road sup.'s Existing APTS03-2
APTS02-06
Transit Management Onboard Security Cameras Provide visual coverage of bus (digital storage) Existing APTS05-05
Transit Information Headsigns Provide route and directional information Existing APTS08-07
Transit Management Scheduling Software Allow for fixed route scheduling and mapping Existing APTS02-06
Transit Management Scheduling Software Para Transit scheduling and mapping Existing APTS03-2
Transit Management Web Interface Receive, process and track comments Existing APTS08-07
Transit Management Phone Line Recorder Record and archive CS phone calls Existing AD1-4
Transit Management Dispatch Phone Recorder Record and archive dispatch phone calls Existing AD1-4
Transit Management Farebox Fare collection and passenger count reporting Existing APTS04-07
Transit Management Engine Monitoring Software Monitor engine conditions and report as needed Existing APTS06-3
Transit Information Website Venue for info., complaints and Web Watch Existing APTS08-07
Transit Information Regional Tripliner Software Assist in 511.org trip planning (regional) Existing ATIS01-02
ATIS01-01
APTS08-07
Transit Management Transit Infrastructure Security Cameras Provide visual coverage of building entrances Ongoing APTS05-05
Transit Information On Street Signs Provide real-time bus arrival information (stop) Existing APTS08-07
Transit Management CS Enhancement Software Interactive web and phone scheduling Future APTS03-2
Transit Management Mobile Data Terminal Communicate driver and mechanical info Existing APTS03-2
APTS02-06
Transit AVL/CAD In-Vehicle Logic Unit (IVLU) Process APC and AVL data for wireless upload Existing APTS01-3
Transit Security In-Vehicle Security Technologies such as Panic Button Transit security system Existing APTS05-05

Livermore

Transit Management Transit Signal Priority (Vehicle to Roadside) Allowing transit vehicles higher priority at intersections Future APTS09-07
Arterial Traffic Management Traffic Operations Center TMC Existing ATMS03-10
ATMS01-10
Network Surveillance Web-Based Real-Time Video Information Traffic Surveillance Ongoing ATMS01-10
Arterial Traffic Management Citywide Signal Coordination Signal Coordination Ongoing ATMS03-10

Los Gatos

Arterial Traffic Management Traffic Signal System Upgrade Signal Upgrade Future ATMS03-10
ITS Integration SV-ITS Program network connection to Los Gatos System integration Future High-Level Diagram
ATMS03-10

Menlo Park

Arterial Traffic Management EI Camino Real Adaptive Signal Project Signal improvement Existing ATMS03-10
Arterial Traffic Management Willow Rd SR-114, Adaptive Signal Project Signal improvement Future ATMS03-10
Emergency Vehicle Preemption Citywide Emergency Vehicle Preemption Allowing emergency vehicles higher priorities at intersection Ongoing EM02-6
EM02-5
EM02-4

Milpitas

Network Surveillance Closed Circuit Television (CCTV) Camera Deployment on Major Travel Corridors Traffic Surveillance Future ATMS01-10
Arterial Traffic Management South Milpitas Blvd Smart Corridor Arterial traffic management coordination Future ATMS03-10
ATMS01-10
Arterial Traffic Management Traffic Signal System Upgrade Signal Upgrade Future ATMS03-10

Morgan Hill

Arterial Traffic Management Cochrane Ave Corridor Traffic Signal System Improvement Signal improvement Future ATMS03-10
Arterial Traffic Management Traffic Signal System Upgrade Signal Upgrade Future ATMS03-10

Mountain View

Arterial Traffic Management Rengstorff Ave Traffic Signal System Improvement Arterial traffic management coordination Future ATMS03-10
Arterial Traffic Management Evelyn Ave Traffic Management between Bush St to Bernardo Rd Arterial traffic management coordination Future ATMS03-10
Arterial Traffic Management Shoreline Blvd Traffic Management between El Camino Real and Villa St Arterial traffic management coordination Future ATMS03-10

MTC

Arterial Traffic Management S/W Data Repository Arterial traffic management Future N/A
Transit Management TransLink® Electronic Fare Collection Regional electronic fare payment system for transit. Existing High-Level Diagram
APTS04-14
APTS04-13
APTS04-12
APTS04-10
APTS04-09
APTS04-08
APTS04-07
APTS04-06
APTS04-05
APTS04-04
APTS04-02
APTS04-01
Traveler Information 511 Traffic Information Regional traffic information via 511 phone number, 511.org, CMS, etc. and includes traffic speeds, incidents, driving times, predicted travel times, parking, etc. Existing High-Level Diagrams
ATIS01-02
ATIS01-01
Transit Information 511 Real Time Transit Information Regional real-time transit arrival information via 511 phone, 511.org, dynamic message signs, etc. Ongoing High-Level Diagrams
APTS08-12
Transit Information 511 Transit Information Regional transit information via 511 phone number, 511.org, signs, etc. and includes a dynamic transit trip planning tool. Existing High-Level Diagrams
ATIS02-3
ATIS02-2
ATIS02-1
ITS Integration Center-to-Center Network (Smart Corridors - Sfgo, East Bay, Silicon Valley, San Mateo) System integration Ongoing High-Level Diagrams
ATMS07-08
ATMS07-07
ATMS07-04
ATMS07-03
Toll Management FasTrak Electronic Toll Collection Regional electronic toll collection system for bridge tolls. Existing ATMS10-1
Commercial Vehicle Management Goods Movement Container Reservation System Freight Management Future N/A
Toll Management Regional High Occupancy Toll (HOT) Lane Network HOV-Toll lane Future ATMS05-1
Freeway Traffic Management Freeway Service Patrol Freeway incident identification and fast response/clearance with roving tow trucks. Telecommunications equipment in trucks relays ops data to CHP CAD. Ongoing EM04-1
ITS Integration Integrate 511 with Center to Center Integrate 511 with neighbor region 511 systems through C-2-C communication Future High-Level Diagrams
ATIS01-03
Parking Management Regional Parking Payment (TransLink/FasTrak) Enable parking payment at meters and garages with TransLink and/or FasTrak. Future High-Level Diagram
ATMS16-4
Toll Management Open Road Tolling Open road tolling on Benicia Martinez Bridget using FasTrak ETC system. Ongoing ATMS10-4
Toll Management Video Tolling Demonstration Collecting toll based on license plate image. Future ATMS10-4
Toll Management Advanced Toll Collection and Accounting System (ATCAS 2) Replacement of the toll collection system in lane plaza and central processing enhancement. Future ATMS10-1
Traveler Information 511 Rideshare/Bicycle Information Regional rideshare and bicycling information via 511 phone number and 511.org and includes ridematching and bikemapping tools. Existing High-Level Diagrams
ATIS01-03

MTC/Caltrans

Vehicle Infrastructure Integration Vehicle-Infrastructure Integration (VII) Testbed VII implementation experiments Ongoing ATIS10-1
ATIS09-1

MTC/SAFE

Emergency Management Call Box Program Provides roadside telecommunication services to motorists in the event of an incident. Existing EM03-1

Napa Valley Transit

Transit AVL/CAD Automated Vehicle Location (AVL) AVL Existing APTS01-6
Transit Vehicle Priority Transit Signal Priority (Vehicle to Roadside) Allowing transit vehicles higher priority at intersections Future APTS09-07

Oakland

Arterial Traffic Management Oakland Broadway ITS Project Close Circuit Television (CCTV) cameras, special event management, arterial Changeable Message Sign (CMS), parking guidance Future APTS09-08
Arterial Traffic Management Oakland Transportation Management System Advanced Transportation Management System (ATMS) Ongoing ATMS08-6
ATMS06-05
ATMS03-05
ATMS01-05
Arterial Traffic Management Oakland Coliseum - Airport Intelligent Transportation System (ITS) Project Closed Circuit Television (CCTV) cameras, special event management, arterial Changeable Message Sign (CMS), parking guidance Future ATMS07-05
ITS Integration Integrated Transportation Network Integrate TMC with EOC, Police Department, Fire Department, and Maintenance Yard Ongoing ATMS08-06
Arterial Traffic Management Oakland North Central Business District (CBD) Project Central Business District traffic management Ongoing ATMS03-05

Palo Alto

Arterial Traffic Management Smart Residential Arterials Project Arterial traffic management coordination Future ATMS07-10
Arterial Traffic Management Traffice Signal System Upgrades Signal Upgrade Future ATMS03-10

Pleasant Hill

Arterial Traffic Management Contra Costa Boulevard Traffic Management System Arterial traffic management coordination Ongoing ATMS07-10

Pleasanton

Arterial Traffic Management I-580 Smart Corridor Arterial traffic management coordination Existing ATMS07-04
Network Surveillance Video Detection Video detection for traffic/incident/road conditions Existing ATMS01-10
Arterial Traffic Management Traffic Signal System Signal Upgrade Ongoing ATMS03-10

Redwood City

Arterial Traffic Management Regional Traffic Signalization/Operation Program 2 Traffic Signalization/Operation Program Ongoing ATMS03-10

Rio Vista

Transit AVL/CAD Automated Vehicle Tracking Automated Vehicle Location (AVL) Future APTS01-6

SamTrans

Transit Management Automated Passenger Counter (APC) Expansion Automatically record passenger number Ongoing APTS10-3
Transit AVL/CAD Automatic Vehicle Location (AVL) System AVL Existing APTS01-5
Transit Management Advanced Communications System Transit Communication Existing APTS03-4
APTS02-10
Transit AVL/CAD Computer-Assisted Dispatching (CAD) System Upgrade CAD upgrade Ongoing APTS03-4
APTS02-10
Transit Management Communications System Upgrade Transit Communication Future APTS03-4
APTS02-10
Transit AVL/CAD Computer Aided Dispatch - System Upgrade Transit management Ongoing APTS02-10
Transit Management Fare Collection System Replacement Fare collection Ongoing APTS04-10
Transit Information Predictive Arrivals/Departure System Replacement Predict transit arrival/departure time Future APTS08-09
Transit Vehicle Priority Adaptive Transit Signal Priority (Vehicle to Roadside) Allowing transit vehicles higher priority at intersections Ongoing APTS09-06
Transit Vehicle Priority Signal Prioritization (Part of VTA Bus Rapid Transit) (vehicle to roadside) Ongoing APTS09-10
APTS09-09
Transit Management Manual Pass - Class Counts Fare collection / passenger counting Existing APTS04-10
On-Vehicle Safety System Frontal Collision Warning System Vehicle on-board safety system Existing N/A
Transit Management El Camino Real Bus Rapid Transit (BRT) Coordinated Transit System Future APTS07-5

San Jose

Arterial Traffic Management King/Story Roads Smart Corridor Arterial traffic management coordination Future ATMS07-06
Arterial Traffic Management Coyote Valley Intelligent Transportation System (ITS) Arterial traffic management coordination Future ATMS07-06
Arterial Traffic Management Capitol Expressway Intelligent Transportation System (ITS) Arterial traffic management coordination Future ATMS07-06
Arterial Traffic Management Monterey Highway Intelligent Transportation System (ITS) Arterial traffic management coordination Future ATMS07-06
Arterial Traffic Management Sub Regional Traffic Management Center (TMC) TMC Future ATMS03-06
ATMS01-06
Network Surveillance Mobile Video Surveillance for Emergency Response video surveillance Future ATMS01-06
Arterial Traffic Management Proactive Signal Timing Signal Upgrade Ongoing ATMS03-06
Arterial Traffic Management Replacement of Electronic "No Right" at Light Rail Transit (LRT) Crossings Signal Upgrade Existing ATMS03-06
Emergency Vehicle Preemption San Jose Smart Intersection - Traffic Management Center Controls Emergency Vehicle Pre-Emption Traffic Management Center Controls Emergency Vehicle Pre-Emption Existing EM02-6
EM02-5
EM02-4
ATMS03-06
Traveler Information Motorist Information System DMS Replacement Information for drivers Ongoing ATMS06-06
Freeway Traffic Management Freeway and Incident Management System Freeway and incident management system Future ATMS08-15
ATMS08-07
Emergency Management Construction Incident Management - Transportation and Incident Management Center (TIMC) (Construct Transportation and Incident Management Center to coordinate incident activities with traffic, fire, and police. Includes control center and integrated communications network.) Future ATMS08-07
Parking Management Downtown Parking Guidance System Parking information/guidance Ongoing ATMS16-1
Emergency Management Emergency Vehicle Link System - Traffic Incident Management Center (TIMC) Emergency vehicle communication Future EM02-6
EM02-5
EM02-4
EM01-3
Arterial Traffic Management San Jose Traffic Signal Management Program (signal central) Existing MC07-4
Arterial Traffic Management Field Equipment Upgrades (2070 ATC and Firmware) ITS equipment upgrade Ongoing ATMS03-06
Arterial Traffic Management Neighborhood Business District (NBD) Intelligent Transportation System (ITS) Deployment ITS field devices deployment Future ATMS03-06
Arterial Traffic Management Red Light Running Enforcement Program Cameras enforcing red light running Future N/A
ITS Integration Transportation Communications Network Communication between different ITS components Future N/A
Traveler Information City Hall Traveler Information Center Traveler information collection, processing, and dissemination Ongoing ATIS01-17
Arterial Traffic Management Proactive Signal Timing Program Phase I Signal improvement Existing ATMS03-06
Arterial Traffic Management Proactive Signal Timing Program Phase II Signal improvement Existing ATMS03-06
Emergency Management Tranportation and Incident Management Center (TIMC) / PD Computer Aided Dispatch (CAD) Intergration TMC coordination with incident management Future EM02-6
EM02-5
EM02-4
Arterial Traffic Management Smart Intersections Arterial traffic management coordination Future EM02-6
EM02-5
EM02-4
ATMS03-06
Arterial Traffic Management Brokaw/Hostetter Roads Smart Corridor Arterial traffic management coordination Future ATMS03-06
ITS Integration Silicon Valley Smart Corridor Project Phases I, II, and III System upgrade Existing ATMS03-08
Emergency Vehicle Preemption Replace Existing Emergency Vehicle Preemption (EVP)s and Install New EVPs Emergency vehicle preemption system Future EM02-6
EM02-5
EM02-4

San Leandro

Network Surveillance San Leandro Closed Circuit Television (CCTV) CCTV camera installation Existing ATMS01-10
Arterial Traffic Management San Leandro Signal System and Traffic Management Center (TMC) (Upgrade) Signal Upgrade Ongoing ATMS03-10
Emergency Vehicle Preemption Emergency Vehicle Preemption EVP Ongoing EM02-6
EM02-5
EM02-4

San Mateo City/County Association of Governments (C/CAG)

Arterial Traffic Management San Mateo C/CAG Roadside Equipment (CCTV cameras, trailblazers, transit signal priority, CMS, adaptive ramp metering) Future ATMS06-11
ATMS06-10
ATMS03-10
ATMS01-10
APTS09-07
Emergency Management Incident Management Plan for US 101 Incident Management Plan Future N/A
Arterial Traffic Management Local Transportation Management Center TMC Future ATMS03-10
ATMS01-10
Emergency Management Integrated Transportation Incident Management Incident management Future ATMS08-11

Santa Clara

Arterial Traffic Management Traffic Signal Cabinet and Controller Replacement Signal Upgrade Future ATMS03-10
Arterial Traffic Management Transportation Management Center Upgrade TMC upgrade Future ATMS03-10
ATMS01-10
Arterial Traffic Management Communications Network Upgrade communication system upgrade Future N/A

Santa Rosa

Arterial Traffic Management Traffic Management Center TMC Ongoing ATMS03-10
ATMS01-10
Arterial Traffic Management Traffic Signal Synchronization Signal improvement Ongoing ATMS03-10
Arterial Traffic Management Adaptive Traffic Signal Controls Signal improvement Ongoing ATMS03-10

Santa Rosa CityBus

Transit AVL/CAD Automated Vehicle Location (AVL), Scheduling Software, NextBus Technology, Global Positioning System (GPS) Video System, Transit Signal Priority Transit real time control system Ongoing APTS09-07
APTS08-10
APTS01-6

Saratoga

Arterial Traffic Management Closed Circuit Television (CCTV) Project CCTV camera installation Future ATMS01-10
Arterial Traffic Management Citywide Signal Upgrade Project Phase II Signal Upgrade Future ATMS03-10
Arterial Traffic Management Traffic Signal System Upgrade Signal Upgrade Future ATMS03-10

SFCTA

Toll Management Areawide Pricing (Planning/Feasability) Toll management system Future N/A
Transit Vehicle Priority Doyle Drive Value Pricing Transit signal priority and varying toll rates Future APTS09-04

SFMTA

Transit Management Automatic Passenger Counter System Passenger counting system Ongoing APTS10-4
Traveler Information Automated Vehicle Location (AVL) and Vehicle Arrival Predictions AVL and Vehicle Arrival Predictions Existing APTS08-13
APTS01-4
Transit AVL/CAD Radio Replacement Communications/AVL-Global Positioning System (GPS) Radio Voice and Data Communications, Computer-Aided Dispatch, integration with AVL Future APTS02-8
Transit Management Scheduling/Auto-Dispatch Systems (just fixed route) Ongoing APTS02-07
Arterial Traffic Management Third Street Corridor ITS field devices deployment including transit signal priority for light rail vehicles Ongoing ATMS03-07
ATMS03-07A
Transit Management Ticket Vending Machine and Subway Fare Gate Replacement Transit fare collection Ongoing APTS04-09
Transit Management Paratransit Debit Card Transit fare collection Ongoing APTS04-15
Transit Security Subway & Surface Playform Closed Circuit Television (CCTV) Replacement - Station Related ITS field devices deployment Future APTS05-06
ITS Integration Integrated Vehicle & Facilities Maint. System Inventory Control Transit management system Future APTS06-6
Transit Information Digital Voice Annunciation System, Nextstop Announcement Transit information system Ongoing APTS08-08
Transit Information Subway Public Address and Platform Display Systems Replacement Transit information system Future APTS08-08
Transit Information Subway Station Talking Signs Transit information system Future APTS08-08
Transit Vehicle Priority Transit Signal Priority Allow MUNI transit vehicles priority at intersections Ongoing APTS09-04
Traveler Information City Services 311 Information System Traveler information system Existing N/A
ITS Integration SFgo - Integrated Transportation Management System Integrated Arterial Management System Existing ATMS06-07
ATMS03-07
ATMS01-07
Parking Management Real Time Parking - Parking Availability on Web, 511 Parking management system Future ATMS17-1
Parking Management On-Street Parking Management – Meters (Translink (smart card) ready) Parking management system Future High-Level Diagram
ATMS16-2
Parking Management Parking Guidance - Dynamic Message Sign (DMS) Parking management system Future ATMS17-1
Emergency Vehicle Preemption Emergency Vehicle Preemption Allowing emergency vehicles higher priorities at the intersections Ongoing EM02-3
ITS Integration Advanced Train Control System Transit management system Existing APTS02-9
APTS01-4
ITS Integration MTA Transit Management Central Control Facility Expansion/Replacement Transit management center Future APTS05-06
ITS Integration Center-to-Center Network Traffic management center Ongoing High-Level Diagrams
ATMS07-07
Transit Management Geary Bus Rapid Transit (BRT) Bus rapid transit on Geary Future APTS09-04
Transit Management Van Ness Bus Rapid Transit (BRT) Bus rapid transit on Van Ness Future APTS09-04

Solano County

Transit AVL/CAD Solano County Transit Automated Vehicle Locator System Automated vehicle location system Ongoing APTS01-6

Sonoma County Transit

Transit Vehicle Priority Transit Signal Priority (Vehicle to Roadside) Allowing transit vehicles higher priority at intersections Future APTS09-07
Transit Vehicle Priority TransTrack Automated vehicle location system Ongoing APTS09-07

Sunnyvale

Arterial Traffic Management Closed Circuit Television (CCTV) Camera Deployment ITS field devices deployment Future ATMS01-10
ITS Integration Traffic Management Center (TMC) Integration Traffic management center Future ATMS07-10
ATMS06-11
ATMS06-10
ATMS03-10
ATMS01-10
Arterial Traffic Management Traffic Adaptive Signal System on Major Arterials Signal improvement Future ATMS03-10
Arterial Traffic Management Traffic Signal Controller Update Signal Upgrade Future ATMS03-10
Arterial Traffic Management Count and Speed Monotoring Stations Arterial management system Future ATMS01-10
Arterial Traffic Management Intelligent Transportation System (ITS) Communications Infrastructure ITS field devices deployment Future N/A
Arterial Traffic Management Wolfe Road Traffic Signal Coordination/Spread Spectrum Radio Interconnect Signal improvement Future ATMS03-10

SV ITS - San Jose Program Manager

ITS Integration San Jose International Airport - Advanced Transportation Management System (ATMS), multiple phases Coordination of multi-mode transportation Existing ATMS08-07
ITS Integration Silicon Valley - ITS (SILICON VALLEY - Intelligent Transportation System (SV-ITS)) Program Upgrades System upgrade Future High-Level Diagram
ATMS03-08
ITS Integration www.511sv.org Traveler information system Existing High-Level Diagrams
ATIS01-05
ATIS01-04
ITS Integration Silicon Valley Intelligent Transportation System (ITS) Milpitas/Fremont Project Integrated arterial and freeway management system Existing High-Level Diagram
ATMS07-08
Emergency Management Silicon Valley Intelligent Transportation System (ITS) West Project Integrated arterial and freeway management system Ongoing High-Level Diagram
ATMS07-08
Arterial Traffic Management Silicon Valley Transportation Incident Management Center Traffic management center Ongoing High-Level Diagram
ATMS08-09
ATMS07-08
ATMS01-08
Transit AVL/CAD Hybrid Analog/Digital Video Management System communication system upgrade Ongoing ATMS01-08
ITS Integration SILICON VALLEY - Intelligent Transportation System (SV-ITS) Enhancement Project Integrated arterial and freeway management system Ongoing High-Level Diagram
ATMS07-08
ITS Integration Wide Area Network Upgrade communication system upgrade Future N/A
ITS Integration Silicon Valley - Intelligent Transportation System (SV-ITS) Program Updates Integrated arterial and freeway management system Ongoing High-Level Diagram
ATMS07-08
ITS Integration Sunnyvale Silicon Valley - Intelligent Transportation System (SV-ITS) Integrated arterial and freeway management system Future High-Level Diagram
ATMS07-08
Traveler Information Silicon Valley - Intelligent Transportation System (SV-ITS) Traveler Information Website Phase I Traveler information website Existing High-Level Diagram
ATIS01-21
Traveler Information Silicon Valley - Intelligent Transportation System (SV-ITS) Traveler Information Website Phase II Traveler information website Future High-Level Diagram
ATIS01-21

Vallejo

Arterial Traffic Management Traffic Signal Interconnect Signal improvement Existing ATMS03-10

Vallejo Transit

Arterial Traffic Management Advanced Traveler Information System Signal improvement Existing APTS08-07

VTA

Toll Management US 101 & SR 85 High Occupancy Toll (HOT) Lane Toll management system Future ATMS05-1
Transit AVL/CAD Automated Vehicle Location (AVL) and Communication System Upgrade Automated vehicle location system Future APTS03-6
APTS02-12
APTS01-5
Transit Information Dynamic Passenger Information (DPI) Traveler information system Ongoing APTS08-11
Transit Vehicle Priority Rapid 522 Bus Signal Priority (BSP) Allowing transit vehicles higher priority at intersections Existing APTS09-10
APTS09-09
Freeway Traffic Management Countrywide Ramp Metering Study Integrated arterial and freeway management system Future N/A

Walnut Creek

Arterial Traffic Management Traffic Signal System Upgrade Signal Upgrade Ongoing ATMS03-10

Water Transit Authority

Transit Management Ferry Real Time Ferry Management Ongoing APTS04-14

WestCAT

Transit Management Automated Passenger Counters (APC) Automated passenger counting system Future APTS10-3
Transit AVL/CAD Automated Vehicle Location Automated vehicle location system Ongoing APTS01-6
Transit Management Electronic Farebox/Collection Transit fare collection system Future APTS04-12
Transit Security Security Updates Transit security monitoring system Future APTS05-08
Transit Information Real-Time Predictive Arrivals/Departures Transit arrival and departure information Future APTS08-10
Transit Vehicle Priority Transit Signal Priority (Vehicle to Roadside) Allowing transit vehicles higher priority at intersections Future APTS09-07
Transit Management Ferry Real Time Ferry Management Ongoing APTS04-14