ADOT TOC and ADOT Ramp Meters

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned

Send Your Comments
SourceArchitecture FlowsDestination
ADOT TOC signal control commands (P)

ADOT Ramp Meters
ADOT Ramp Meters signal control status (P)

right-of-way request notification (P)

ADOT TOC

Last updated: 06-23-13