METRO Light Rail OCC and METRO Light Rail Vehicles

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned

Send Your Comments
SourceArchitecture FlowsDestination
METRO Light Rail OCC secure area surveillance control (E)

alarm acknowledge (E)

transit vehicle operator information (E)

transit vehicle schedule performance (E)

transit vehicle location data (E)

METRO Light Rail Vehicles
METRO Light Rail Vehicles secure area surveillance data (E)

alarm notification (E)

transit vehicle operator information to center_ud (E)

transit vehicle schedule performance (E)

transit vehicle location data (E)

METRO Light Rail OCC

Last updated: 06-23-13